Service Online
400-0177-727
You are here:Home > Products > Exterior Wall > Flat coating > Manzz Inorganic Mineral Coating (Exterior Wall)

Manzz Inorganic Mineral Coating (Exterior Wall)

Product Series Exterior Wall - Flat coating
Product Name Manzz Inorganic Mineral Coating (Exterior Wall)
Packaging specifications 面漆: 6kg / 20kg; 底漆: 5kg / 15kg
Product Features Class A Fire Resistance,Antibacterial And Mildewproof,Strong Washability,Odorless And Environmental Protection
Product Detail

scope of application

Suitable for general mineral substrate surfaces, such as various types of concrete, cement, natural stone, lime, gypsum, brick walls, putty, and other mineral substrate surface decorations.

Suitable for business office buildings, hotels, villas, shopping malls, kindergartens and other projects. It is particularly suitable for people with allergies, especially in the medical field.

 

Usage parameters

Main components: inorganic liquid silicate, inorganic composite filler, additives, water.

● Salt and alkali resistance: No foaming, peeling or cracking after 96 hours.

Dry paint film thickness: 30-50 u m/layer

Drying time: Surface drying takes about 2 hours, actual drying takes 7 days/25 ℃, and sufficient curing takes more than 20 days.

● Repainting time: not less than 2 hours

Theoretical dosage: 0  1-0. 12kg/m2/coat (the actual amount of paint used may vary depending on the construction method and surface flatness).

 

Construction technology

Please use Manzz inorganic mineral coating with primer.

Stir evenly before use.

The surface before painting should be free of grease, dust, and loose substances. Newly constructed walls must be fully dried, and the surface moisture content of the wall (or putty) must be less than 10%, with a pH value below 10.

Used tools should be immediately cleaned with soap and warm water. Do not reuse utensils that have come into contact with different types and performance paints. If necessary, the residue should be removed and thoroughly cleaned before use.

This product can be painted using paint sweep, roller or spray methods, usually requiring two coats. Under normal circumstances, the interval between each coat should be at least 2 hours (based on touch dry at 25 ℃). During winter construction, the recoating time should be appropriately extended; Do not polish the final coat of paint.

During construction, it is required that the base temperature should be between ℃ and 25 ℃ or the environmental humidity should not exceed 85%.

When using dark colored products for construction, it is recommended not to dilute them with water. If necessary for construction, please control the dilution ratio within 5% and increase the number of coats appropriately until satisfactory results are achieved.

 

precautions

Due to the special nature of Manzz inorganic mineral coatings, there is a selection of colorants, and the use of colorants for color matching is prohibited. If color matching is required, please contact the factory.

Manzz inorganic mineral coating has a longer drying time than ordinary wall paint, usually taking 14 to 21 days to reach the best paint film state.

Store in a sealed container, in a cool, ventilated, and dry warehouse, protected from direct sunlight, and the storage environment temperature should be maintained at 5-35 ° C; During storage, it is normal for precipitation to occur between C. Stir evenly before use.

During construction, air circulation should be maintained and the area should be kept away from direct sunlight and heat sources.

If it comes into contact with the eyes, it should be immediately washed with plenty of water and treated by a doctor.

● Keep out of reach of children.

Disclaimer: It is recommended to conduct a small-scale trial before use. If the use of this product exceeds our company's control, we will not be held responsible for any losses or damages caused by improper use.


Online consultation
Inquire to obtain more investment promotion information and materials, as well as product brochures
Franchise Inquiry