Construction method:
Brushing and spraying methods can be used for construction
Dilution:
Before painting, the paint should be stirred evenly. If the viscosity is too high, an appropriate amount of water can be added, and the amount of water added should not exceed 10%. The paint should be stirred while adding to ensure uniformity.
Substrate processing:
① New substrate surface: Remove surface dust, oil stains, and other contaminants to ensure a clean, dry, and smooth surface.
② Old substrate surface: Remove surface oil stains, floating rust, loose, cracked old paint films, etc. until the surface is firm and flat, and wipe clean.
③ For rusted iron tools, the surface rust must be thoroughly removed and wiped clean before construction.
Construction conditions:
① Please do not apply in humid or cold weather (temperature below 5 ℃ or above 35 ℃, relative humidity greater than 85%), otherwise the expected coating effect cannot be achieved.
② Please use in a well ventilated area. If it is necessary to work in a closed environment, ventilation devices must be installed and appropriate protective equipment must be used.
Water addition conditions:
To achieve the best brushing effect, the amount of water added to a 3kg bucket of this product should not exceed one 300ml bottle of mineral water.
Repainting time:
When applying the second coat, the first coat should be completely dry with a minimum interval of 24 hours.
Maintenance time:
7 days/25 ℃; Low temperature (not lower than 5 ℃) should be appropriately prolonged to achieve the desired paint film effect.
Tool cleaning:
After the construction is completed, the tools used should be immediately rinsed with clean water to prevent them from drying out. The remaining paint should be immediately sealed and stored. If there is dry skin that affects use, it can be filtered with a 100 mesh wire mesh before use.
matters needing attention:
It is strictly prohibited to mix with other coatings and organic solvents.
Storage matters:
Store tightly in a cool and dry place at 0-35 ℃.